Georgia Pacific: Loading Platform
Georgia Pacific (UK) Limited
Stubborns Mill, Ramsbottom.
Scaffolding was required for the introduction of new machinery to the first floor of an existing building.
A free standing structural scaffolding was designed and constructed.
The structural scaffold was erected and dismantled to allow for new machinery to be installed within the building.
Please click here to view or download this case study



